Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,804
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0613 # 02 Y:2012 | 02 | 2012 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $16,300 | $20,900 | Implemented |
AM0613 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,265 | $600 | Implemented |
AM0613 # 05 Y:2012 | 05 | 2012 | USE PHOTOCELL CONTROLS | $3,000 | $1,000 | Implemented |
AM0613 # 06 Y:2012 | 06 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $694 | $108 | Implemented |
AM0613 # 07 Y:2012 | 07 | 2012 | USE PHOTOCELL CONTROLS | $49 | $100 | Implemented |
MAS024 # 01 Y:2012 | 01 | 2012 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $19,562 | $150 | Implemented |
MAS024 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,749 | $0 | Implemented |
UM0403 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,740 | $6,369 | Implemented |
UM0401 # 03 Y:2012 | 03 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $34,019 | $5,000 | Implemented |
UM0401 # 04 Y:2012 | 04 | 2012 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,066 | $448 | Implemented |
UA0080 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,321 | $480 | Implemented |
UA0080 # 04 Y:2012 | 04 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $981 | $364 | Implemented |
UA0080 # 06 Y:2012 | 06 | 2012 | USE PHOTOCELL CONTROLS | $632 | $270 | Implemented |
IA0479 # 01 Y:2012 | 01 | 2012 | INSTALL OCCUPANCY SENSORS | $2,675 | $2,732 | Implemented |
IA0479 # 02 Y:2012 | 02 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,268 | $549 | Implemented |
IA0479 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,057 | $158 | Implemented |
NC0451 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,790 | $14,320 | Implemented |
NC0451 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $444 | $1,674 | Implemented |
NC0451 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $252 | $533 | Implemented |
NC0451 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,516 | $4,075 | Implemented |
NC0451 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $158 | $100 | Implemented |
WV0445 # 04 Y:2012 | 04 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $10,469 | $0 | Implemented |
WV0445 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,693 | $40,964 | Implemented |
WV0445 # 06 Y:2012 | 06 | 2012 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,421 | $415 | Implemented |
WV0445 # 10 Y:2012 | 10 | 2012 | INSULATE BARE EQUIPMENT | $3,234 | $4,181 | Implemented |