IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

986

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0472 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $4,166 $2,000 Implemented
MA0472 # 05 Y:2000 05 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,589 $2,000 Implemented
MA0472 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,347 $315 Implemented
MA0472 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $1,195 $3,000 Implemented
MA0472 # 08 Y:2000 08 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $1,064 $3,000 Implemented
SD0246 # 03 Y:2000 03 2000 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,276 $3,000 Implemented
SD0246 # 05 Y:2000 05 2000 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $336 $0 Implemented
SD0246 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $220,320 $13,000 Implemented
SD0246 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $32,080 $20,000 Implemented
ND0348 # 01 Y:2000 01 2000 REPLACE BOILER $4,017 $10,000 Implemented
ND0348 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $271 $925 Implemented
ND0348 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $268 $200 Implemented
ND0348 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $524 $385 Implemented
ND0348 # 06 Y:2000 06 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $433 $400 Implemented
BD0142 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,333 $2,050 Implemented
BD0142 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $325 $675 Implemented
BD0142 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $141 $0 Implemented
BD0142 # 04 Y:1999 04 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $25,426 $5,000 Implemented
BD0142 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,080 $6,500 Implemented
MA0450 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $1,042 $1,000 Implemented
MA0450 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,892 $5,813 Implemented
MA0450 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,423 $5,216 Implemented
MA0450 # 06 Y:1999 06 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $537 $0 Implemented
MA0447 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,131 $4,925 Implemented
MA0447 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $591 $120 Implemented