IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,651

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0243 # 06 Y:2000 06 2000 $17,680 $0 Implemented
WI0365 # 03 Y:2000 03 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,830 $26,500 Implemented
WI0365 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,131 $5,808 Implemented
WI0365 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,017 $0 Implemented
WI0365 # 06 Y:2000 06 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,168 $7,500 Implemented
WI0365 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,922 $600 Implemented
UF0239 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,096 $0 Implemented
UF0239 # 03 Y:1999 03 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,982 $0 Implemented
UF0239 # 04 Y:1999 04 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $53,580 $0 Implemented
AM0365 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $4,070 $2,740 Implemented
AM0365 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,090 $8 Implemented
AM0365 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $950 $850 Implemented
AM0365 # 06 Y:2000 06 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $660 $0 Implemented
AM0365 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $260 $100 Implemented
AM0365 # 08 Y:2000 08 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $120 $0 Implemented
UM0153 # 04 Y:2000 04 2000 RECOVER AND REUSE WASTE MATERIAL $17,500 $1,000 Implemented
MS0149 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $790 $263 Implemented
MS0149 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,504 $2,060 Implemented
GT0676 # 02 Y:1999 02 1999 RECOVER AND REUSE WASTE MATERIAL $11,148 $0 Implemented
UL0232 # 03 Y:1999 03 1999 RECOVER AND REUSE COOLING WATER $56,903 $5,370 Implemented
NV0135 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $813 $332 Implemented
NV0135 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,201 $1,000 Implemented
AS0262 # 02 Y:1999 02 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,369 $1,700 Implemented
AS0262 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,548 $100 Implemented
GT0672 # 01 Y:1999 01 1999 REDUCE FLUID FLOW RATES $4,090 $600 Implemented