IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0338 # 05 Y:2002 05 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $875 $2,400 Implemented
AS0338 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $395 $1,422 Implemented
AS0339 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $286 $314 Implemented
AS0339 # 04 Y:2002 04 2002 $113,273 $9,000 Implemented
MS0219 # 05 Y:2002 05 2002 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $23,617 $1,500 Implemented
MS0219 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,902 $97 Implemented
MS0219 # 03 Y:2002 03 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $67,886 $1,950 Implemented
MS0219 # 07 Y:2002 07 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,779 $1,113 Implemented
MS0219 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,971 $696 Implemented
WI0433 # 01 Y:2002 01 2002 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $14,150 $13,000 Implemented
WI0433 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,467 $20,000 Implemented
WI0433 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,251 $1,100 Implemented
WI0433 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $1,228 $4,000 Implemented
WI0433 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $519 $740 Implemented
TA0040 # 01 Y:2002 01 2002 USE A DIFFERENT OR RECYCLED RAW MATERIAL $11,200 $12,425 Implemented
MA0524 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $501 $158 Implemented
MA0524 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,117 $2,000 Implemented
MA0524 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $179 $750 Implemented
TA0040 # 03 Y:2002 03 2002 INCREASE EFFICIENCY OF TRUCKS $2,552 $0 Implemented
TA0040 # 02 Y:2002 02 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,952 $0 Implemented
BD0217 # 06 Y:2002 06 2002 MINIMIZE WATER USAGE $334 $200 Implemented
BD0217 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $345 $700 Implemented
BD0217 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,250 $1,500 Implemented
CO0513 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,420 $600 Implemented
OR0417 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,232 $0 Implemented