Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163
matching recommendationsSIC | 3229 | Pressed And Blown Glass, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0641 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,189 | $70,634 | Implemented |
WV0612 # 10 Y:2021 | 10 | 2021 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $701 | $397 | Implemented |
WV0612 # 11 Y:2021 | 11 | 2021 | INSTALL SET-BACK TIMERS | $611 | $1,110 | Implemented |
WV0612 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,008 | $8,132 | Implemented |
WV0612 # 03 Y:2021 | 03 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,446 | $16,700 | Implemented |
WV0612 # 06 Y:2021 | 06 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,641 | $4,320 | Implemented |
NC0629 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,243 | $610 | Implemented |
MZ0250 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $1,786 | $280 | Implemented |
MZ0250 # 01 Y:2018 | 01 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,351 | $5,600 | Implemented |
MZ0250 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,697 | $0 | Implemented |
WV0547 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $175 | $850 | Implemented |
WV0547 # 09 Y:2017 | 09 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $243 | $1,000 | Implemented |
WV0547 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $412 | $2,050 | Implemented |
WV0547 # 01 Y:2017 | 01 | 2017 | INSULATE BARE EQUIPMENT | $15,992 | $5,658 | Implemented |
WV0547 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,491 | $9,434 | Implemented |
WV0547 # 06 Y:2017 | 06 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $970 | $4,600 | Implemented |
NC0556 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $59,808 | $90,000 | Implemented |
NC0556 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,584 | $8,350 | Implemented |
NC0556 # 05 Y:2015 | 05 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,836 | $4,256 | Implemented |
NC0556 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,438 | $12,000 | Implemented |
NC0556 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $578 | $868 | Implemented |
UD0923 # 08 Y:2015 | 08 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $5,978 | $19,581 | Implemented |
UD0923 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,241 | $50 | Implemented |
UD0923 # 10 Y:2015 | 10 | 2015 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $343 | $0 | Implemented |
UD0923 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,734 | $0 | Implemented |