IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

910

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0290 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,977 $829 Implemented
IA0290 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,829 $13,425 Implemented
IA0290 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $29,170 $18,259 Implemented
IC0032 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39,454 $19,500 Implemented
SF0234 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,185 $300 Implemented
SF0234 # 08 Y:2002 08 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,441 $49,000 Implemented
LE0131 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,624 $0 Implemented
LE0131 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,376 $4,500 Implemented
IC0031 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,703 $10,800 Implemented
IC0031 # 02 Y:2002 02 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,312 $3,338 Implemented
IC0031 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,264 $2,894 Implemented
IC0031 # 06 Y:2002 06 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,800 $3,080 Implemented
OK0630 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,953 $300 Implemented
OK0630 # 03 Y:2001 03 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,994 $3,700 Implemented
OK0630 # 04 Y:2001 04 2001 INSTALL SET-BACK TIMERS $11,800 $3,370 Implemented
MS0191 # 01 Y:2001 01 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $35,695 $1,000 Implemented
MS0191 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,525 $1,000 Implemented
IA0282 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $489 $174 Implemented
IA0282 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,095 $3,205 Implemented
IA0282 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,847 $0 Implemented
IA0282 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,255 $0 Implemented
IA0282 # 08 Y:2001 08 2001 USE RADIANT HEATER FOR SPOT HEATING $6,750 $9,596 Implemented
MA0498 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,844 $60,000 Implemented
MA0498 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $10,867 $0 Implemented
MA0498 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,980 $0 Implemented