IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

897

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0571 # 01 Y:1999 01 1999 RECYCLE CASTING SAND $227,844 $135,000 Implemented
UD0571 # 04 Y:1999 04 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,000 $64,000 Implemented
UD0571 # 08 Y:1999 08 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,582 $0 Implemented
WV0162 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $317 $20 Implemented
WV0162 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,920 $109 Implemented
WV0162 # 07 Y:1999 07 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,780 $36 Implemented
WV0162 # 08 Y:1999 08 1999 USE SYNTHETIC LUBRICANT $988 $636 Implemented
WV0162 # 09 Y:1999 09 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $381 $150 Implemented
WV0162 # 13 Y:1999 13 1999 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $20,000 $432 Implemented
UD0563 # 03 Y:1999 03 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $26,365 $31,000 Implemented
UD0563 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,212 $9,270 Implemented
OR0331 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,374,400 $105,000 Implemented
OR0331 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,781 $1,000 Implemented
AM0332 # 01 Y:1998 01 1998 METER WASTE WATER $7,230 $8,500 Implemented
AM0332 # 02 Y:1998 02 1998 REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS $6,620 $16,675 Implemented
AM0332 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,700 $2,665 Implemented
AM0332 # 06 Y:1998 06 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $775 $1,200 Implemented
AM0332 # 07 Y:1998 07 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $460 $0 Implemented
AM0332 # 08 Y:1998 08 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $380 $0 Implemented
AM0332 # 09 Y:1998 09 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $380 $0 Implemented
AM0332 # 10 Y:1998 10 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $350 $20 Implemented
OR0328 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,828 $1,000 Implemented
OR0328 # 03 Y:1998 03 1998 INSULATE BARE EQUIPMENT $1,700 $5,385 Implemented
OR0328 # 05 Y:1998 05 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,386 $0 Implemented
UD0555 # 01 Y:1998 01 1998 EXPAND OPERATIONS INTO UNUSED SPACE $237,283 $1,313,000 Implemented