Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 3339 Primary Nonferrous Metals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0827 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,909 $26,950 Implemented
MA0827 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,685 $2,000 Implemented
UU0177 # 09 Y:2021 09 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,497 $100 Implemented
UU0177 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,105 $11,650 Implemented
UU0177 # 02 Y:2021 02 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $36,240 $6,760 Implemented
UU0177 # 05 Y:2021 05 2021 OPTIMIZE PLANT POWER FACTOR $10,455 $14,250 Implemented
UU0177 # 08 Y:2021 08 2021 REDUCE VENTILATION AIR $4,129 $4,000 Implemented
UU0177 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,515 $5,046 Implemented
SF0468 # 03 Y:2015 03 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,761 $0 Implemented
SF0468 # 06 Y:2015 06 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,031 $8,158 Implemented
SF0468 # 05 Y:2015 05 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,141 $1,658 Implemented
SF0468 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,506 $8,348 Implemented
SF0468 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $2,043 $1,679 Implemented
SF0468 # 10 Y:2015 10 2015 REPLACE BOILER $9,878 $51,914 Implemented
SF0468 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $356 $274 Implemented
SF0468 # 01 Y:2015 01 2015 REPAIR AND ELIMINATE STEAM LEAKS $3,541 $0 Implemented
OR0644 # 03 Y:2015 03 2015 ELIMINATE/REDUCE AN OPERATION $106,634 $72,750 Implemented
OR0644 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $37,274 $20,400 Implemented
OR0644 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,865 $3,865 Implemented
UM0435 # 01 Y:2013 01 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,450 $4,500 Implemented
UM0435 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $966 $2,500 Implemented
UM0435 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,000 $3,000 Implemented
OR0592 # 03 Y:2012 03 2012 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $40,400 $70,000 Implemented
OR0592 # 04 Y:2012 04 2012 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $15,020 $0 Implemented
UA0062 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,769 $2,440 Implemented