IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0681 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $12,917 $4,800 Implemented
UL0237 # 02 Y:1999 02 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,512 $0 Implemented
UF0233 # 06 Y:1999 06 1999 $33,600 $0 Implemented
UF0233 # 05 Y:1999 05 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $10,287 $14,925 Implemented
UF0233 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,649 $320 Implemented
UF0233 # 02 Y:1999 02 1999 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,008 $750 Implemented
GT0668 # 04 Y:1999 04 1999 INSTALL TIMERS AND/OR THERMOSTATS $678 $1,000 Implemented
GT0668 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,662 $345 Implemented
GT0668 # 08 Y:1999 08 1999 $1,449,000 $234,000 Implemented
GT0668 # 01 Y:1999 01 1999 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $3,706 $0 Implemented
GT0674 # 03 Y:1999 03 1999 REPAIR AND ELIMINATE STEAM LEAKS $4,037 $400 Implemented
GT0674 # 06 Y:1999 06 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,892 $14,981 Implemented
GT0674 # 07 Y:1999 07 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $419 $100 Implemented
HO0211 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $200 Implemented
HO0211 # 10 Y:1999 10 1999 $15,600 $480 Implemented
HO0211 # 08 Y:1999 08 1999 USE COMPRESSOR AIR FILTERS $6,130 $150 Implemented
HO0211 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $900 $2,000 Implemented
HO0211 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,364 $20 Implemented
HO0211 # 03 Y:1999 03 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,289 $1,500 Implemented
HO0211 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,114 $9,233 Implemented
HO0211 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,520 $15,297 Implemented
UL0227 # 05 Y:1999 05 1999 $5,430 $1,799 Implemented
TN0661 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $25,103 $30,600 Implemented
TN0661 # 01 Y:1999 01 1999 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $175,335 $5,000 Implemented
AR0160 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,374 $50 Implemented