IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0469 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $107 Implemented
WI0469 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $588 $249 Implemented
WI0469 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $626 $0 Implemented
WI0469 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,071 $0 Implemented
WI0432 # 01 Y:2002 01 2002 RECOVER AND REUSE WASTE MATERIAL $16,280 $8,000 Implemented
WI0432 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,052 $150 Implemented
WI0432 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $957 $356 Implemented
WI0415 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,596 $1,000 Implemented
WI0415 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,252 $1,086 Implemented
WI0415 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $307 $68 Implemented
WI0353 # 04 Y:1999 04 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $6,159 $22,000 Implemented
WI0353 # 05 Y:1999 05 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,879 $0 Implemented
WI0353 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,440 $640 Implemented
WI0343 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,468 $60 Implemented
WI0225 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $2,110 $1,365 Implemented
WI0225 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,909 $1,280 Implemented
WI0153 # 03 Y:1992 03 1992 OPTIMIZE PLANT POWER FACTOR $5,209 $9,758 Implemented
WI0053 # 05 Y:1989 05 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $487 $1,000 Implemented
WI0053 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $577 $500 Implemented
WI0053 # 03 Y:1989 03 1989 INSTALL STORM WINDOWS AND DOORS $2,689 $6,820 Implemented
WI0053 # 02 Y:1989 02 1989 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $12,776 $15,000 Implemented
WI0053 # 01 Y:1989 01 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $68,209 $80,000 Implemented
WI0048 # 07 Y:1989 07 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $136,661 $0 Implemented
WI0048 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,825 $2,925 Implemented
WI0048 # 01 Y:1989 01 1989 IMPROVE LUBRICATION PRACTICES $6,089 $0 Implemented