Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,079
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0046 # 08 Y:2002 | 08 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $2,460 | $1,600 | Implemented |
WI0432 # 01 Y:2002 | 01 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $16,280 | $8,000 | Implemented |
WI0432 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,052 | $150 | Implemented |
WI0432 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $957 | $356 | Implemented |
BD0218 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,529 | $1,100 | Implemented |
BD0218 # 14 Y:2002 | 14 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $11,760 | $1,000 | Implemented |
BD0218 # 16 Y:2002 | 16 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $7,800 | $500 | Implemented |
IA0291 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,222 | $685 | Implemented |
IA0291 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,929 | $920 | Implemented |
IA0291 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,242 | $25,134 | Implemented |
IA0291 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,844 | $476 | Implemented |
IA0291 # 07 Y:2002 | 07 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,689 | $7,199 | Implemented |
IA0291 # 08 Y:2002 | 08 | 2002 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $7,328 | $25,016 | Implemented |
IA0291 # 10 Y:2002 | 10 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $55,348 | $77,600 | Implemented |
WI0415 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,596 | $1,000 | Implemented |
WI0415 # 05 Y:2002 | 05 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,252 | $1,086 | Implemented |
WI0415 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $307 | $68 | Implemented |
LM0028 # 01 Y:2002 | 01 | 2002 | INSULATE BARE EQUIPMENT | $10,685 | $980 | Implemented |
LM0028 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,807 | $800 | Implemented |
LM0028 # 08 Y:2002 | 08 | 2002 | MODIFY WORKLOAD | $202,176 | $2,200 | Implemented |
LM0024 # 01 Y:2002 | 01 | 2002 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $7,010 | $2,500 | Implemented |
LM0024 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,154 | $3,000 | Implemented |
LM0024 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,155 | $0 | Implemented |
LM0024 # 05 Y:2002 | 05 | 2002 | CLEAR AND RENT EXISTING SPACE | $110,000 | $4,500 | Implemented |
LM0024 # 06 Y:2002 | 06 | 2002 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $237,600 | $0 | Implemented |