Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,079
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0277 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,030 | $1,720 | Implemented |
SD0277 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $3,648 | $7,000 | Implemented |
SD0277 # 11 Y:2001 | 11 | 2001 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $2,383 | $2,000 | Implemented |
SD0273 # 03 Y:2001 | 03 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,519 | $2,000 | Implemented |
SD0273 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $822 | $200 | Implemented |
SD0273 # 05 Y:2001 | 05 | 2001 | UPGRADE OBSOLETE EQUIPMENT | $5,286 | $15,000 | Implemented |
SD0273 # 07 Y:2001 | 07 | 2001 | USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) | $3,043 | $500 | Implemented |
SD0273 # 08 Y:2001 | 08 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,000 | $3,500 | Implemented |
LE0103 # 03 Y:2001 | 03 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,154 | $1,600 | Implemented |
LE0103 # 04 Y:2001 | 04 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,904 | $12,900 | Implemented |
LE0103 # 06 Y:2001 | 06 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $17,100 | $12,300 | Implemented |
SU0101 # 01 Y:2001 | 01 | 2001 | RECYCLE CASTING SAND | $35,529 | $45,000 | Implemented |
SU0101 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $370 | $0 | Implemented |
UM0182 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $568 | $375 | Implemented |
UM0182 # 03 Y:2001 | 03 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $57,900 | $28,900 | Implemented |
UM0179 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,864 | $450 | Implemented |
UM0179 # 06 Y:2001 | 06 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,286 | $500 | Implemented |
BD0178 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,182 | $0 | Implemented |
BD0178 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $2,842 | $1,800 | Implemented |
BD0178 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,341 | $400 | Implemented |
BD0178 # 08 Y:2001 | 08 | 2001 | USE EVAPORATION TO CONCENTRATE MATERIAL | $20,240 | $3,600 | Implemented |
MO0292 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,121 | $2,933 | Implemented |
MO0292 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,365 | $11,960 | Implemented |
MO0292 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,842 | $339 | Implemented |
MO0292 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,013 | $80 | Implemented |