Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,255
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0221 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $563 | $245 | Implemented |
IA0221 # 06 Y:1999 | 06 | 1999 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $25,571 | $2,950 | Implemented |
IA0221 # 08 Y:1999 | 08 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $20,642 | $11,793 | Implemented |
AS0253 # 04 Y:1999 | 04 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $428 | $225 | Implemented |
AS0253 # 05 Y:1999 | 05 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $468 | $560 | Implemented |
AS0253 # 07 Y:1999 | 07 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,611 | $1,060 | Implemented |
AS0253 # 08 Y:1999 | 08 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $780 | $60 | Implemented |
UL0222 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,708 | $8,456 | Implemented |
UL0222 # 05 Y:1999 | 05 | 1999 | REDUCE OR ELIMINATE WASTE | $15,966 | $1,448 | Implemented |
UL0222 # 08 Y:1999 | 08 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $53,880 | $0 | Implemented |
MA0441 # 01 Y:1999 | 01 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,168 | $5,704 | Implemented |
MA0441 # 02 Y:1999 | 02 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $43,200 | $3,000 | Implemented |
MA0441 # 05 Y:1999 | 05 | 1999 | UPGRADE OBSOLETE EQUIPMENT | $789 | $0 | Implemented |
MA0441 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $632 | $2,250 | Implemented |
HO0204 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,583 | $16,842 | Implemented |
HO0204 # 02 Y:1999 | 02 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $901 | $0 | Implemented |
HO0204 # 06 Y:1999 | 06 | 1999 | INSULATE FEEDWATER TANK | $526 | $438 | Implemented |
HO0204 # 07 Y:1999 | 07 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,911 | $2,450 | Implemented |
HO0204 # 10 Y:1999 | 10 | 1999 | MAINTAIN/ENLARGE A STOCK OF SPARE PARTS | $1,125 | $318 | Implemented |
HO0204 # 13 Y:1999 | 13 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,250 | $120 | Implemented |
MA0440 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,896 | $15,790 | Implemented |
MA0440 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,444 | $3,400 | Implemented |
MA0440 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,278 | $5,204 | Implemented |
MA0440 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $709 | $1,245 | Implemented |
AS0252 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,570 | $220 | Implemented |