IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,255

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0252 # 05 Y:1999 05 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $515 $80 Implemented
MS0133 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,085 $881 Implemented
MS0133 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $534 $236 Implemented
MS0133 # 06 Y:1999 06 1999 $48,956 $6,286 Implemented
MA0442 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,396 $38,500 Implemented
MA0442 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,380 $11,544 Implemented
MA0442 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $964 $2,575 Implemented
MA0442 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $402 $955 Implemented
MA0442 # 07 Y:1999 07 1999 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $257 $640 Implemented
MA0439 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $8,636 $1,360 Implemented
MA0439 # 03 Y:1999 03 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,629 $500 Implemented
MA0439 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,038 $1,295 Implemented
WI0348 # 01 Y:1999 01 1999 ELIMINATE SHIFT $28,000 $40,000 Implemented
WI0348 # 04 Y:1999 04 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,867 $4,200 Implemented
WI0348 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $229 $60 Implemented
AR0162 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $636 $952 Implemented
AR0162 # 05 Y:1999 05 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $29,203 $0 Implemented
AR0162 # 06 Y:1999 06 1999 INCREASE USE OF AUTOMATION $29,203 $25,000 Implemented
WI0347 # 02 Y:1999 02 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,386 $0 Implemented
WI0347 # 05 Y:1999 05 1999 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,037 $0 Implemented
WI0347 # 07 Y:1999 07 1999 INSTALL TIMERS AND/OR THERMOSTATS $638 $1,000 Implemented
WV0164 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,403 $675 Implemented
WV0164 # 02 Y:1999 02 1999 DISCONNECT BALLASTS $3,291 $320 Implemented
WV0164 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,863 $228 Implemented
WV0164 # 07 Y:1999 07 1999 RECOVER WASTE HEAT FROM EQUIPMENT $918 $428 Implemented