Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,255
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AR0148 # 06 Y:1998 | 06 | 1998 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $39,295 | $91,825 | Implemented |
AR0148 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,787 | $1,000 | Implemented |
MO0236 # 02 Y:1998 | 02 | 1998 | CHANGE OPERATING CONDITIONS | $553 | $380 | Implemented |
MO0236 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,270 | $1,717 | Implemented |
MO0236 # 05 Y:1998 | 05 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,639 | $2,805 | Implemented |
MO0236 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $206 | $0 | Implemented |
MO0236 # 07 Y:1998 | 07 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $49,600 | $15,000 | Implemented |
OR0322 # 01 Y:1998 | 01 | 1998 | REDUCE SCRAP PRODUCTION | $22,000 | $12,480 | Implemented |
AS0232 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,829 | $20,012 | Implemented |
AS0232 # 04 Y:1998 | 04 | 1998 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,577 | $785 | Implemented |
IA0200 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,523 | $705 | Implemented |
IA0200 # 10 Y:1998 | 10 | 1998 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $27,121 | $4,200 | Implemented |
NC0146 # 01 Y:1998 | 01 | 1998 | COVER OPEN TANKS | $488 | $600 | Implemented |
NC0146 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $920 | $800 | Implemented |
NC0146 # 03 Y:1998 | 03 | 1998 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $409 | $1,480 | Implemented |
NC0146 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $178 | $200 | Implemented |
NC0146 # 05 Y:1998 | 05 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $13,890 | $1,500 | Implemented |
NC0146 # 06 Y:1998 | 06 | 1998 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $2,431 | $0 | Implemented |
TN0641 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,810 | $5,000 | Implemented |
TN0641 # 03 Y:1998 | 03 | 1998 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $3,560 | $2,500 | Implemented |
TN0641 # 04 Y:1998 | 04 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,130 | $980 | Implemented |
TN0642 # 01 Y:1998 | 01 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $177,600 | $510,000 | Implemented |
TN0642 # 02 Y:1998 | 02 | 1998 | MODIFY CURRENT INCENTIVE PROGRAM | $81,550 | $16,885 | Implemented |
TN0642 # 04 Y:1998 | 04 | 1998 | REDUCE SCRAP PRODUCTION | $33,515 | $24,000 | Implemented |
TN0642 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $660 | $2,190 | Implemented |