IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0236 # 07 Y:1998 07 1998 RECOVER AND REUSE WASTE MATERIAL $49,600 $15,000 Implemented
OR0322 # 01 Y:1998 01 1998 REDUCE SCRAP PRODUCTION $22,000 $12,480 Implemented
AS0232 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,829 $20,012 Implemented
AS0232 # 04 Y:1998 04 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,577 $785 Implemented
IA0200 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,523 $705 Implemented
IA0200 # 10 Y:1998 10 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $27,121 $4,200 Implemented
NC0146 # 01 Y:1998 01 1998 COVER OPEN TANKS $488 $600 Implemented
NC0146 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $920 $800 Implemented
NC0146 # 03 Y:1998 03 1998 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $409 $1,480 Implemented
NC0146 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $178 $200 Implemented
NC0146 # 05 Y:1998 05 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,890 $1,500 Implemented
NC0146 # 06 Y:1998 06 1998 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $2,431 $0 Implemented
TN0641 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,810 $5,000 Implemented
TN0641 # 03 Y:1998 03 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,560 $2,500 Implemented
TN0641 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,130 $980 Implemented
TN0642 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $177,600 $510,000 Implemented
TN0642 # 02 Y:1998 02 1998 MODIFY CURRENT INCENTIVE PROGRAM $81,550 $16,885 Implemented
TN0642 # 04 Y:1998 04 1998 REDUCE SCRAP PRODUCTION $33,515 $24,000 Implemented
TN0642 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $2,190 Implemented
TN0642 # 07 Y:1998 07 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $300 $0 Implemented
TN0642 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $500 Implemented
TN0642 # 09 Y:1998 09 1998 USE SYNTHETIC LUBRICANT $150 $0 Implemented
UM0120 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,860 $1,000 Implemented
UM0120 # 03 Y:1998 03 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,029 $1,000 Implemented
UM0120 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,783 $100 Implemented