Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,274
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0201 # 05 Y:1998 | 05 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $22,080 | $0 | Implemented |
UF0203 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,287 | $1,200 | Implemented |
UF0203 # 05 Y:1998 | 05 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,933 | $11,000 | Implemented |
UF0203 # 07 Y:1998 | 07 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,277 | $4,000 | Implemented |
UL0194 # 02 Y:1998 | 02 | 1998 | RECOVER AND REUSE SPENT ACID BATHS | $67,100 | $32,500 | Implemented |
UL0194 # 03 Y:1998 | 03 | 1998 | CONVERT TO AQUEOUS CLEANING | $3,798 | $4,160 | Implemented |
UL0194 # 04 Y:1998 | 04 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $4,200 | $4,200 | Implemented |
HO0181 # 03 Y:1998 | 03 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $532 | $325 | Implemented |
HO0181 # 04 Y:1998 | 04 | 1998 | INSULATE BARE EQUIPMENT | $1,232 | $1,008 | Implemented |
HO0181 # 05 Y:1998 | 05 | 1998 | INSULATE FEEDWATER TANK | $227 | $72 | Implemented |
HO0181 # 06 Y:1998 | 06 | 1998 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,922 | $250 | Implemented |
WI0324 # 02 Y:1998 | 02 | 1998 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $487 | $0 | Implemented |
WI0324 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,054 | $400 | Implemented |
WI0324 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $381 | $90 | Implemented |
WI0324 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $372 | $640 | Implemented |
AM0324 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $28,430 | $104,000 | Implemented |
AM0324 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,000 | $500 | Implemented |
AM0324 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,800 | $1,500 | Implemented |
AM0324 # 08 Y:1998 | 08 | 1998 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $820 | $0 | Implemented |
AM0324 # 09 Y:1998 | 09 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $590 | $1,310 | Implemented |
AM0324 # 10 Y:1998 | 10 | 1998 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $150 | $165 | Implemented |
UM0121 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,850 | $2,048 | Implemented |
UM0121 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $511 | $1,000 | Implemented |
UM0121 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $761 | $990 | Implemented |
UM0121 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,085 | $6,000 | Implemented |