IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

264

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0300 # 09 Y:2023 09 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,809 $156 Implemented
TT0300 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,614 $19,910 Implemented
TT0300 # 11 Y:2023 11 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,868 $1,965 Implemented
TT0300 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $41,095 $32,000 Implemented
TT0280 # 02 Y:2022 02 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $29,003 $9,880 Implemented
TT0280 # 05 Y:2022 05 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $19,766 $0 Implemented
TT0280 # 01 Y:2022 01 2022 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $52,932 $4,800 Implemented
TT0280 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $21,150 $0 Implemented
TT0276 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $22,303 $60 Implemented
TT0276 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,344 $24,750 Implemented
TT0276 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,657 $3,175 Implemented
TT0276 # 09 Y:2022 09 2022 CHANGE OPERATING CONDITIONS $6,750 $2,000 Implemented
TT0274 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,530 $0 Implemented
TT0274 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,579 $18,000 Implemented
TT0266 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,458 $6,147 Implemented
TT0266 # 05 Y:2022 05 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,049 $1,100 Implemented
TT0266 # 03 Y:2022 03 2022 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,496 $2,400 Implemented
TT0266 # 01 Y:2022 01 2022 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $32,000 $3,900 Implemented
TT0200 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $9,558 $46,250 Implemented
TT0200 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,772 $1,000 Implemented
TT0202 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $16,093 $1,430 Implemented
TT0202 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,716 $83,867 Implemented
TT0202 # 07 Y:2017 07 2017 INSTALL TIMERS AND/OR THERMOSTATS $197 $100 Implemented
TT0202 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $403 $678 Implemented
TT0183 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,441 $7,000 Implemented