IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

232

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0434 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $5,168 $11,700 Implemented
WI0434 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,191 $588 Implemented
WI0434 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,556 $740 Implemented
TA0043 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,980 $0 Implemented
TA0043 # 03 Y:2002 03 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,390 $0 Implemented
TA0043 # 02 Y:2002 02 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,735 $0 Implemented
TA0043 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $670 $0 Implemented
UD0658 # 01 Y:2002 01 2002 $962,280 $448,000 Implemented
UD0658 # 02 Y:2002 02 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $20,837 $16,100 Implemented
UD0658 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,063 $8,000 Implemented
WI0429 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $514 $150 Implemented
SD0306 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,468 $0 Implemented
UU0028 # 03 Y:2002 03 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $30,500 $7,600 Implemented
UU0028 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $844 $406 Implemented
UU0028 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $986 $0 Implemented
UU0028 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,450 $700 Implemented
UU0028 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,400 $2,000 Implemented
UU0028 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $5,590 $9,800 Implemented
LM0044 # 05 Y:2002 05 2002 $216,000 $3,400 Implemented
LM0044 # 04 Y:2002 04 2002 $14,885 $0 Implemented
LM0044 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,025 $625 Implemented
OK0643 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $1,163 $1,440 Implemented
NC0250 # 09 Y:2002 09 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,251 $420 Implemented
OK0643 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,970 $300 Implemented
OK0643 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $3,635 $558 Implemented