Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

152

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1062 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,294 $2,732 Implemented
OK1062 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,957 $30,186 Implemented
OK1062 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $101 $580 Implemented
OK1062 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,554 $0 Implemented
OK1052 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,648 $13,284 Implemented
OK1040 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,923 $2,911 Implemented
OK1040 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,152 $4,457 Implemented
OK0971 # 09 Y:2017 09 2017 INSTALL SET-BACK TIMERS $977 $1,306 Implemented
OK0971 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,570 $10,263 Implemented
OK0971 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,254 $39,396 Implemented
OK0848 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,100 $4,500 Implemented
OK0848 # 04 Y:2013 04 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,477 $6,160 Implemented
OK0848 # 07 Y:2013 07 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $546 $540 Implemented
OK0848 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $5,376 Implemented
OK0761 # 05 Y:2008 05 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,200 $0 Implemented
OK0761 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $14,263 $4,638 Implemented
OK0761 # 04 Y:2008 04 2008 INSTALL SET-BACK TIMERS $3,105 $1,908 Implemented
OK0761 # 01 Y:2008 01 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,213 $0 Implemented
OK0761 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $525 $2,871 Implemented
OK0620 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,592 $615 Implemented
OK0620 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $238 $1,470 Implemented
OK0620 # 04 Y:2001 04 2001 REPAIR AND ELIMINATE STEAM LEAKS $1,442 $200 Implemented
OK0620 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,130 $40 Implemented
OK0620 # 05 Y:2001 05 2001 INSTALL SET-BACK TIMERS $8,700 $1,170 Implemented
OK0590 # 03 Y:2000 03 2000 BURN WASTE OIL FOR HEAT $2,892 $3,490 Implemented