IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

495

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0220 # 03 Y:1998 03 1998 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,126 $275 Implemented
AS0220 # 04 Y:1998 04 1998 DISCONNECT BALLASTS $355 $15 Implemented
AS0220 # 08 Y:1998 08 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,895 $12,030 Implemented
AS0220 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,801 $100 Implemented
AS0220 # 11 Y:1998 11 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,179 $90 Implemented
AS0220 # 13 Y:1998 13 1998 ADD ADDITIONAL PRODUCTION SHIFT $495,547 $14,720 Implemented
HO0169 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,077 $6,192 Implemented
HO0169 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $4,900 Implemented
HO0169 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,604 $2,236 Implemented
HO0169 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $777 $800 Implemented
HO0169 # 07 Y:1998 07 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $22,500 $14,400 Implemented
HO0169 # 08 Y:1998 08 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,000 $1,000 Implemented
AS0216 # 06 Y:1998 06 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,307 $940 Implemented
AS0216 # 08 Y:1998 08 1998 ADOPT IN-HOUSE MATERIAL GENERATION $2,435 $375 Implemented
AS0216 # 09 Y:1998 09 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $35,483 $960 Implemented
ND0290 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,285 $2,390 Implemented
ND0290 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $100 Implemented
ND0290 # 04 Y:1997 04 1997 ELIMINATE OXYGEN LOSS $479 $20 Implemented
ND0290 # 06 Y:1997 06 1997 INSTALL REPLACEMENT DOORS $355 $1,050 Implemented
ND0290 # 07 Y:1997 07 1997 PAY BILLS ON TIME TO AVOID LATE FEES $325 $0 Implemented
ND0290 # 08 Y:1997 08 1997 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $303 $335 Implemented
ND0290 # 09 Y:1997 09 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $20 $0 Implemented
KU0490 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,990 $650 Implemented
KU0490 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $860 $2,000 Implemented
KU0490 # 03 Y:1998 03 1998 USE SYNTHETIC LUBRICANT $710 $1,510 Implemented