IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0261 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $0 Implemented
BD0261 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $586 $150 Implemented
IC0035 # 09 Y:2002 09 2002 RECOVER AND REUSE WASTE MATERIAL $97 $120 Implemented
IC0035 # 08 Y:2002 08 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,977 $4,813 Implemented
IC0035 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,103 $83,780 Implemented
IC0035 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $12,947 $2,657 Implemented
IC0035 # 10 Y:2002 10 2002 REPROCESS SPENT OILS ON SITE FOR RE-USE $4,000 $3,500 Implemented
BD0196 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $984 $1,725 Implemented
BD0196 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,477 $200 Implemented
BD0196 # 10 Y:2001 10 2001 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,862 $750 Implemented
WI0370 # 03 Y:2000 03 2000 REPLACE CLOTH RAGS WITH PAPER TOWELS $3,255 $0 Implemented
BD0139 # 10 Y:1999 10 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,154 $9,500 Implemented
BD0139 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $275 $410 Implemented
BD0139 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $630 $545 Implemented
BD0139 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,316 $0 Implemented
BD0139 # 02 Y:1999 02 1999 USE SYNTHETIC LUBRICANT $7,711 $2,400 Implemented
BD0139 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,947 $28,000 Implemented
WI0317 # 06 Y:1998 06 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $794 $0 Implemented
WI0317 # 04 Y:1998 04 1998 $1,611 $0 Implemented
WI0212 # 10 Y:1994 10 1994 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,000 $7,000 Implemented
WI0212 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $5,416 $492 Implemented
WI0212 # 06 Y:1994 06 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $585 $370 Implemented
WI0174 # 02 Y:1993 02 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,898 $0 Implemented
WI0108 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,400 $10,000 Implemented
WI0108 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $893 $232 Implemented