IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

437

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0234 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,897 $3,680 Implemented
SU0234 # 07 Y:2006 07 2006 REPAIR OR REPLACE STEAM TRAPS $2,258 $623 Implemented
SU0234 # 08 Y:2006 08 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,470 $8,599 Implemented
SU0234 # 10 Y:2006 10 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $7,801 $6,762 Implemented
SU0234 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,955 $48,745 Implemented
SU0234 # 13 Y:2006 13 2006 INSULATE BARE EQUIPMENT $792 $1,409 Implemented
SU0234 # 16 Y:2006 16 2006 INSTALL OCCUPANCY SENSORS $500 $1,351 Implemented
SU0228 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,378 $0 Implemented
SU0228 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $31,676 $40,711 Implemented
SU0228 # 03 Y:2006 03 2006 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $39,585 $111,774 Implemented
SU0228 # 04 Y:2006 04 2006 INCREASE USE OF AUTOMATION $1,765,875 $3,500,000 Implemented
LM0101 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,490 $18,642 Implemented
LM0101 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,390 $1,225 Implemented
LM0090 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $429 $280 Implemented
SD0349 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,934 $4,300 Implemented
SD0349 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,757 $920 Implemented
SD0349 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,407 $3,423 Implemented
SD0349 # 06 Y:2004 06 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,780 $18,500 Implemented
NC0288 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,564 $435 Implemented
NC0288 # 02 Y:2004 02 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,570 $1,725 Implemented
NC0288 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $239 $100 Implemented
NC0288 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $15,216 $3,800 Implemented
BD0261 # 01 Y:2004 01 2004 USE PHOTOCELL CONTROLS $2,004 $1,500 Implemented
BD0261 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,039 $400 Implemented
BD0261 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $586 $150 Implemented