IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

175

matching recommendations
Reset
SIC 3451 Screw Machine Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0492 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $480 $200 Implemented
NV0137 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $372 $300 Implemented
NV0137 # 03 Y:1999 03 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $198 $25 Implemented
NV0137 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,390 $7,970 Implemented
UM0149 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $836 $500 Implemented
UM0149 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $618 $200 Implemented
UM0149 # 06 Y:1999 06 1999 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $8,500 $40,000 Implemented
UM0148 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,826 $2,464 Implemented
UM0148 # 04 Y:1999 04 1999 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $12,311 $40,000 Implemented
ND0321 # 01 Y:1999 01 1999 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $103,932 $0 Implemented
ND0321 # 04 Y:1999 04 1999 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $1,555 $7,050 Implemented
ND0321 # 05 Y:1999 05 1999 OPTIMIZE PLANT POWER FACTOR $2,989 $12,575 Implemented
ND0321 # 08 Y:1999 08 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $730 $125 Implemented
ND0321 # 10 Y:1999 10 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $130 Implemented
AS0247 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $498 $20 Implemented
AS0247 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $587 $1,275 Implemented
AS0247 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $226 $253 Implemented
AS0247 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $19,300 $120 Implemented
AS0247 # 08 Y:1999 08 1999 ADD ADDITIONAL PRODUCTION SHIFT $25,200 $24,000 Implemented
ND0302 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $345 $80 Implemented
ND0302 # 06 Y:1998 06 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $315 $60 Implemented
ND0302 # 10 Y:1998 10 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $189 $0 Implemented
ND0302 # 11 Y:1998 11 1998 PAY BILLS ON TIME TO AVOID LATE FEES $123 $0 Implemented
AS0171 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,051 $9,221 Implemented
AS0171 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,958 $20,409 Implemented