IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,137

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0660 # 16 Y:2003 16 2003 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $1,260 $0 Implemented
UD0660 # 20 Y:2003 20 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $150 $0 Implemented
OK0653 # 02 Y:2003 02 2003 USE OPTIMUM THICKNESS INSULATION $14,697 $8,210 Implemented
UD0658 # 01 Y:2002 01 2002 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $962,280 $448,000 Implemented
UD0658 # 02 Y:2002 02 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $20,837 $16,100 Implemented
UD0658 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,063 $8,000 Implemented
WI0429 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $514 $150 Implemented
IA0293 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,150 $1,034 Implemented
IA0293 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,893 $224 Implemented
IA0293 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $261 $333 Implemented
IA0293 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,134 $0 Implemented
UD0649 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,660 $6,691 Implemented
UD0649 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,306 $6,000 Implemented
UD0649 # 10 Y:2002 10 2002 MINIMIZE WATER USAGE $373 $0 Implemented
UD0649 # 11 Y:2002 11 2002 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $92 $0 Implemented
LM0030 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $115,143 $300 Implemented
LM0029 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $592 $735 Implemented
LM0029 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,200 $0 Implemented
LM0029 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,118 $500 Implemented
LM0029 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,628 $700 Implemented
LM0029 # 10 Y:2002 10 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $7,500 $1,000 Implemented
LM0029 # 11 Y:2002 11 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $7,500 $1,000 Implemented
UD0640 # 02 Y:2002 02 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $57,385 $82,200 Implemented
UD0640 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,815 $7,700 Implemented
LE0130 # 03 Y:2002 03 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,040 $0 Implemented