IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 3463 Nonferrous Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0538 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $5,664 $2,520 Implemented
SD0538 # 02 Y:2016 02 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $17,613 $46,250 Implemented
SD0538 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $952 $750 Implemented
SD0538 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,200 $13,950 Implemented
SD0538 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,549 $26,272 Implemented
SD0538 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $577 $1,000 Implemented
SD0375 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,793 $3,000 Implemented
SD0375 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,903 $13,350 Implemented
LM0018 # 04 Y:2001 04 2001 $7,800 $2,250 Implemented
LM0018 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $724 $350 Implemented
SD0283 # 06 Y:2001 06 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,992 $2,300 Implemented
SD0283 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,393 $480 Implemented
SD0283 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,044 $18,000 Implemented
SD0279 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,073 $1,400 Implemented
SD0279 # 06 Y:2001 06 2001 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,667 $1,000 Implemented
SD0279 # 13 Y:2001 13 2001 $322,709 $20,000 Implemented
SD0272 # 01 Y:2001 01 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,159 $5,200 Implemented
SD0272 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,857 $120,000 Implemented
SD0272 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,213 $400 Implemented
SD0272 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,172 $7,600 Implemented
SD0272 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,078 $2,000 Implemented
SD0190 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,072 $0 Implemented
SD0190 # 09 Y:1998 09 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,443 $6,942 Implemented
SD0190 # 10 Y:1998 10 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $2,302 $2,150 Implemented
SD0190 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,620 $1,350 Implemented