IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
Reset
SIC 348 Ordnance And Accessories, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0421 # 07 Y:2011 07 2011 DEVELOP A REPAIR/REPLACE POLICY $4,203 $841 Implemented
WV0421 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $4,166 $1,910 Implemented
WV0421 # 10 Y:2011 10 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,731 $21 Implemented
WV0421 # 12 Y:2011 12 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,007 $3,000 Implemented
WV0421 # 13 Y:2011 13 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,849 $386 Implemented
WV0421 # 15 Y:2011 15 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $294 $241 Implemented
WV0421 # 16 Y:2011 16 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $266 $191 Implemented
LL0324 # 01 Y:2009 01 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $51,066 $5,850 Implemented
UA0036 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,392 $0 Implemented
UA0036 # 02 Y:2009 02 2009 INSTALL TIMERS AND/OR THERMOSTATS $3,429 $1,700 Implemented
UA0036 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,387 $40,768 Implemented
UA0036 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $912 $1,500 Implemented
MA0634 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,014 $119,495 Implemented
MA0634 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,932 $2,500 Implemented
MA0634 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $498 $500 Implemented
OR0523 # 01 Y:2007 01 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,000 $60,000 Implemented
OR0523 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,220 $1,160 Implemented
IA0394 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,729 $4,200 Implemented
IA0394 # 02 Y:2006 02 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $24,709 $6,500 Implemented
IA0394 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,998 $25 Implemented
AS0415 # 01 Y:2006 01 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $19,739 $5,500 Implemented
AS0415 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,372 $1,000 Implemented
UF0309 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,113 $340 Implemented
UF0309 # 02 Y:2002 02 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,774 $3,840 Implemented
UF0309 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,173 $23,719 Implemented