Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0794 # 01 Y:2018 | 01 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $84,640 | $121,500 | Implemented |
MA0794 # 04 Y:2018 | 04 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $1,216 | $852 | Implemented |
MA0773 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,580 | $14,050 | Implemented |
MA0773 # 03 Y:2017 | 03 | 2017 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,593 | $10,625 | Implemented |
MA0773 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,500 | $1,000 | Implemented |
MA0769 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $90,487 | $39,330 | Implemented |
MA0738 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $347 | $400 | Implemented |
MA0738 # 01 Y:2015 | 01 | 2015 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $59,139 | $500 | Implemented |
MA0738 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,551 | $1,000 | Implemented |
MAS023 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $596 | $0 | Implemented |
MAS023 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,899 | $9,580 | Implemented |
MAS023 # 01 Y:2012 | 01 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,820 | $44,000 | Implemented |
MAS023 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,502 | $7,500 | Implemented |
MAS023 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,970 | $8,500 | Implemented |
MA0597 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,984 | $17,660 | Implemented |
MA0597 # 04 Y:2006 | 04 | 2006 | REDUCE VENTILATION AIR | $4,902 | $1,000 | Implemented |
MA0597 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $2,161 | $668 | Implemented |
MA0597 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,402 | $0 | Implemented |
MA0597 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $5,643 | $17,818 | Implemented |
MA0568 # 02 Y:2005 | 02 | 2005 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $20,082 | $7,750 | Implemented |
MA0568 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,788 | $12,000 | Implemented |
MA0568 # 04 Y:2005 | 04 | 2005 | OPTIMIZE PLANT POWER FACTOR | $5,122 | $6,750 | Implemented |
MA0568 # 05 Y:2005 | 05 | 2005 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $4,092 | $6,000 | Implemented |
MA0470 # 05 Y:2000 | 05 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $1,402 | $280 | Implemented |
MA0470 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $396 | $280 | Implemented |