IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0794 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $1,216 $852 Implemented
MA0794 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $84,640 $121,500 Implemented
MA0773 # 03 Y:2017 03 2017 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,593 $10,625 Implemented
MA0773 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $1,000 Implemented
MA0773 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,580 $14,050 Implemented
MA0769 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $90,487 $39,330 Implemented
MA0738 # 01 Y:2015 01 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $59,139 $500 Implemented
MA0738 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,551 $1,000 Implemented
MA0738 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $347 $400 Implemented
MAS023 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $596 $0 Implemented
MAS023 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,899 $9,580 Implemented
MAS023 # 01 Y:2012 01 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,820 $44,000 Implemented
MAS023 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,502 $7,500 Implemented
MAS023 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,970 $8,500 Implemented
MA0597 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $5,643 $17,818 Implemented
MA0597 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,984 $17,660 Implemented
MA0597 # 04 Y:2006 04 2006 REDUCE VENTILATION AIR $4,902 $1,000 Implemented
MA0597 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $2,161 $668 Implemented
MA0597 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,402 $0 Implemented
MA0568 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,788 $12,000 Implemented
MA0568 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $5,122 $6,750 Implemented
MA0568 # 05 Y:2005 05 2005 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $4,092 $6,000 Implemented
MA0568 # 02 Y:2005 02 2005 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $20,082 $7,750 Implemented
MA0470 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,495 $365 Implemented
MA0470 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $206 $450 Implemented