IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0015 # 02 Y:2001 02 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,951 $550 Implemented
LM0015 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,264 $800 Implemented
LM0015 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,944 $11,800 Implemented
LM0015 # 09 Y:2001 09 2001 CONTRACT OUT MAINTENANCE $7,300 $0 Implemented
LM0015 # 10 Y:2001 10 2001 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $104,000 $24,000 Implemented
OK0624 # 02 Y:2001 02 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $4,484 $255 Implemented
OK0624 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,627 $240 Implemented
OK0624 # 05 Y:2001 05 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $131,000 $92,000 Implemented
SU0103 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $8,880 $1,125 Implemented
SU0103 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,743 $0 Implemented
SU0103 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $826 $543 Implemented
MI0012 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $656 $260 Implemented
MI0012 # 02 Y:2001 02 2001 UTILIZE JOB COSTING SOFTWARE $58,500 $12,000 Implemented
MI0012 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,550 $306 Implemented
MI0012 # 04 Y:2001 04 2001 CONDENSE OPERATION INTO ONE BUILDING $5,315 $2,040 Implemented
MI0012 # 05 Y:2001 05 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $4,188 $5,000 Implemented
MI0012 # 06 Y:2001 06 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,190 $29 Implemented
IC0010 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,637 $8,900 Implemented
IC0010 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $2,511 $4,312 Implemented
IC0010 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $552 $1,250 Implemented
IC0010 # 07 Y:2001 07 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $45,000 $9,500 Implemented
SU0114 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $508 $0 Implemented
SU0114 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,310 $30 Implemented
NC0216 # 01 Y:2001 01 2001 AVOID REWINDING MOTORS MORE THAN TWICE $902 $662 Implemented
NC0216 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $1,799 $549 Implemented