Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,093
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0387 # 02 Y:2001 | 02 | 2001 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $24,138 | $0 | Implemented |
WI0387 # 03 Y:2001 | 03 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $9,794 | $0 | Implemented |
WI0387 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,726 | $1,994 | Implemented |
WI0387 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $418 | $300 | Implemented |
WI0387 # 07 Y:2001 | 07 | 2001 | USE EVAPORATION TO CONCENTRATE MATERIAL | $8,770 | $16,000 | Implemented |
WI0387 # 09 Y:2001 | 09 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $630 | $640 | Implemented |
WI0387 # 10 Y:2001 | 10 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $387 | $90 | Implemented |
UD0610 # 01 Y:2001 | 01 | 2001 | IMPROVE SPACE COMFORT CONDITIONING | $101,536 | $402,000 | Implemented |
UD0610 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,984 | $6,000 | Implemented |
BD0177 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,288 | $500 | Implemented |
MA0480 # 03 Y:2000 | 03 | 2000 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,330 | $8,000 | Implemented |
MA0480 # 04 Y:2000 | 04 | 2000 | AIR CONDITION ONLY SPACE NECESSARY | $10,600 | $5,000 | Implemented |
MA0480 # 07 Y:2000 | 07 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,450 | $27,000 | Implemented |
MA0480 # 08 Y:2000 | 08 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $8,620 | $2,000 | Implemented |
MA0480 # 09 Y:2000 | 09 | 2000 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $930 | $0 | Implemented |
MA0480 # 10 Y:2000 | 10 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,660 | $5,000 | Implemented |
MA0480 # 11 Y:2000 | 11 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,020 | $0 | Implemented |
MA0480 # 12 Y:2000 | 12 | 2000 | INSTALL OCCUPANCY SENSORS | $12,215 | $1,000 | Implemented |
IA0262 # 03 Y:2000 | 03 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,048 | $0 | Implemented |
IA0262 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $788 | $221 | Implemented |
IA0262 # 06 Y:2000 | 06 | 2000 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $522 | $640 | Implemented |
AM0380 # 02 Y:2000 | 02 | 2000 | COMBINE UTILITY METERS | $3,644 | $8,000 | Implemented |
AM0380 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,800 | $50 | Implemented |
AM0380 # 04 Y:2000 | 04 | 2000 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $1,798 | $0 | Implemented |
AM0380 # 05 Y:2000 | 05 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $527 | $800 | Implemented |