IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0387 # 02 Y:2001 02 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $24,138 $0 Implemented
WI0387 # 03 Y:2001 03 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $9,794 $0 Implemented
WI0387 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,726 $1,994 Implemented
WI0387 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $418 $300 Implemented
WI0387 # 07 Y:2001 07 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $8,770 $16,000 Implemented
WI0387 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $630 $640 Implemented
WI0387 # 10 Y:2001 10 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $90 Implemented
UD0610 # 01 Y:2001 01 2001 IMPROVE SPACE COMFORT CONDITIONING $101,536 $402,000 Implemented
UD0610 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,984 $6,000 Implemented
BD0177 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,288 $500 Implemented
MA0480 # 03 Y:2000 03 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,330 $8,000 Implemented
MA0480 # 04 Y:2000 04 2000 AIR CONDITION ONLY SPACE NECESSARY $10,600 $5,000 Implemented
MA0480 # 07 Y:2000 07 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,450 $27,000 Implemented
MA0480 # 08 Y:2000 08 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $8,620 $2,000 Implemented
MA0480 # 09 Y:2000 09 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $930 $0 Implemented
MA0480 # 10 Y:2000 10 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,660 $5,000 Implemented
MA0480 # 11 Y:2000 11 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,020 $0 Implemented
MA0480 # 12 Y:2000 12 2000 INSTALL OCCUPANCY SENSORS $12,215 $1,000 Implemented
IA0262 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,048 $0 Implemented
IA0262 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $788 $221 Implemented
IA0262 # 06 Y:2000 06 2000 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $522 $640 Implemented
AM0380 # 02 Y:2000 02 2000 COMBINE UTILITY METERS $3,644 $8,000 Implemented
AM0380 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,800 $50 Implemented
AM0380 # 04 Y:2000 04 2000 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,798 $0 Implemented
AM0380 # 05 Y:2000 05 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $527 $800 Implemented