Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
105
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0845 # 02 Y:2022 | 02 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $26,668 | $60,000 | Implemented |
MA0845 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,754 | $14,292 | Implemented |
MA0818 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $746 | $500 | Implemented |
MA0818 # 05 Y:2020 | 05 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $789 | $1,700 | Implemented |
MA0818 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,320 | $9,808 | Implemented |
MA0808 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,080 | $2,000 | Implemented |
MA0808 # 02 Y:2019 | 02 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,454 | $12,318 | Implemented |
MA0782 # 02 Y:2017 | 02 | 2017 | INSULATE BARE EQUIPMENT | $7,638 | $1,583 | Implemented |
MA0782 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,366 | $600 | Implemented |
MA0782 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $277 | $100 | Implemented |
MA0707 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $972 | $200 | Implemented |
MA0707 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $412 | $200 | Implemented |
MA0707 # 01 Y:2013 | 01 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,613 | $1,000 | Implemented |
MA0648 # 04 Y:2009 | 04 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $36,798 | $150,000 | Implemented |
MA0648 # 07 Y:2009 | 07 | 2009 | COVER OPEN TANKS | $5,857 | $1,924 | Implemented |
MA0644 # 03 Y:2009 | 03 | 2009 | REDUCE VENTILATION AIR | $11,580 | $25,000 | Implemented |
MA0644 # 05 Y:2009 | 05 | 2009 | REDUCE VENTILATION AIR | $6,015 | $2,600 | Implemented |
MA0644 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,900 | $0 | Implemented |
MA0644 # 01 Y:2009 | 01 | 2009 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $34,492 | $160,000 | Implemented |
MA0644 # 06 Y:2009 | 06 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,937 | $0 | Implemented |
MA0639 # 10 Y:2008 | 10 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $322 | $2,000 | Implemented |
MA0639 # 06 Y:2008 | 06 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $12,707 | $975 | Implemented |
MA0639 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,993 | $70,840 | Implemented |
MA0639 # 07 Y:2008 | 07 | 2008 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $7,426 | $27,000 | Implemented |
MA0616 # 03 Y:2007 | 03 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,603 | $2,550 | Implemented |