IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

124

matching recommendations
Reset
SIC 3537 Industrial Trucks And Tractors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0484 # 08 Y:2014 08 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,298 $0 Implemented
WV0484 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,693 $468 Implemented
WV0484 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,252 $4,500 Implemented
WV0484 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $11,868 $7,750 Implemented
BD0441 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $3,813 $2,600 Implemented
BD0441 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $280 Implemented
BD0441 # 08 Y:2014 08 2014 CHANGE OPERATING CONDITIONS $1,402 $30 Implemented
BD0441 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,765 $3,000 Implemented
BD0441 # 07 Y:2014 07 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,000 $900 Implemented
UA0054 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,010 $7,000 Implemented
UA0054 # 07 Y:2010 07 2010 INSTALL TIMERS AND/OR THERMOSTATS $4,372 $3,230 Implemented
MS0298 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,600 $53,730 Implemented
MS0298 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,739 $1,313 Implemented
MS0298 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,964 $236 Implemented
MS0298 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,377 $17,617 Implemented
MS0298 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,852 $2,775 Implemented
IA0352 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $3,699 $3,750 Implemented
IA0352 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,216 $416 Implemented
IA0352 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,245 $6 Implemented
IA0352 # 05 Y:2004 05 2004 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $12,016 $2 Implemented
IA0352 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $528 $136 Implemented
IA0352 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,595 $6,618 Implemented
IA0352 # 09 Y:2004 09 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $867,815 $171 Implemented
IA0343 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,173 $7,306 Implemented
IA0343 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $125 $70 Implemented