Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
124
matching recommendationsSIC | 3537 | Industrial Trucks And Tractors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0484 # 08 Y:2014 | 08 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,298 | $0 | Implemented |
WV0484 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,693 | $468 | Implemented |
WV0484 # 06 Y:2014 | 06 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,252 | $4,500 | Implemented |
WV0484 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $11,868 | $7,750 | Implemented |
BD0441 # 01 Y:2014 | 01 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $3,813 | $2,600 | Implemented |
BD0441 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $300 | $280 | Implemented |
BD0441 # 08 Y:2014 | 08 | 2014 | CHANGE OPERATING CONDITIONS | $1,402 | $30 | Implemented |
BD0441 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,765 | $3,000 | Implemented |
BD0441 # 07 Y:2014 | 07 | 2014 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $4,000 | $900 | Implemented |
UA0054 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,010 | $7,000 | Implemented |
UA0054 # 07 Y:2010 | 07 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $4,372 | $3,230 | Implemented |
MS0298 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,600 | $53,730 | Implemented |
MS0298 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,739 | $1,313 | Implemented |
MS0298 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,964 | $236 | Implemented |
MS0298 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,377 | $17,617 | Implemented |
MS0298 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,852 | $2,775 | Implemented |
IA0352 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,699 | $3,750 | Implemented |
IA0352 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,216 | $416 | Implemented |
IA0352 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,245 | $6 | Implemented |
IA0352 # 05 Y:2004 | 05 | 2004 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $12,016 | $2 | Implemented |
IA0352 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $528 | $136 | Implemented |
IA0352 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,595 | $6,618 | Implemented |
IA0352 # 09 Y:2004 | 09 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $867,815 | $171 | Implemented |
IA0343 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,173 | $7,306 | Implemented |
IA0343 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $125 | $70 | Implemented |