IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

928

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0234 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $38,400 $50,000 Implemented
ME0234 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,979 $12,932 Implemented
ME0234 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,153 $10,580 Implemented
ME0234 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,482 $4,476 Implemented
ME0234 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,284 $800 Implemented
ME0234 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $500 Implemented
ME0234 # 07 Y:1998 07 1998 RECOVER AND REUSE COOLING WATER $12,512 $12,000 Implemented
ME0234 # 10 Y:1998 10 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $1,114 $7,000 Implemented
DS0125 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,211 $120 Implemented
DS0125 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $10,382 $3,088 Implemented
UM0126 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,401 $25,843 Implemented
UM0126 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,053 $5,250 Implemented
UM0126 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $862 $1,000 Implemented
UM0126 # 07 Y:1998 07 1998 RECOVER WASTE HEAT FROM EQUIPMENT $9,603 $2,000 Implemented
UM0126 # 08 Y:1998 08 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,264 $1,800 Implemented
UM0126 # 09 Y:1998 09 1998 RECOVER AND REUSE COOLING WATER $6,202 $4,500 Implemented
UM0126 # 10 Y:1998 10 1998 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $200,000 $0 Implemented
UF0209 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,496 $4,720 Implemented
NC0144 # 02 Y:1998 02 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,664 $1,000 Implemented
NC0144 # 04 Y:1998 04 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,617 $4,731 Implemented
NC0144 # 05 Y:1998 05 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $113 $200 Implemented
NC0144 # 06 Y:1998 06 1998 METER WASTE WATER $1,464 $200 Implemented
NC0144 # 07 Y:1998 07 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $5,550 $2,700 Implemented
AR0143 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $269 $460 Implemented
AR0143 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $619 $0 Implemented