IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0450 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,800 $15,000 Implemented
UM0150 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $300 Implemented
BD0137 # 09 Y:1999 09 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,707 $10,000 Implemented
BD0137 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,635 $225 Implemented
DS0136 # 09 Y:1999 09 1999 $1,035 $120 Implemented
DS0136 # 08 Y:1999 08 1999 BURN WASTE OIL FOR HEAT $1,552 $1,695 Implemented
DS0136 # 07 Y:1999 07 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $924 $1,000 Implemented
DS0136 # 06 Y:1999 06 1999 UPGRADE OBSOLETE EQUIPMENT $3,713 $7,827 Implemented
DS0136 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $123 $91 Implemented
DS0136 # 04 Y:1999 04 1999 INSTALL TIMERS AND/OR THERMOSTATS $2,815 $2,459 Implemented
DS0136 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $1,047 $1,960 Implemented
DS0136 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,330 $29,424 Implemented
DS0136 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $1,921 $1,137 Implemented
MO0256 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,574 $10,069 Implemented
MO0256 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,533 $3,290 Implemented
MO0256 # 08 Y:1999 08 1999 $2,520 $3,700 Implemented
UD0570 # 01 Y:1999 01 1999 $27,963 $0 Implemented
UD0570 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,148 $200 Implemented
KU0515 # 05 Y:1999 05 1999 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $3,140 $7,830 Implemented
KU0515 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,780 $400 Implemented
KU0515 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $530 $0 Implemented
HO0201 # 07 Y:1999 07 1999 $1,000 $3,282 Implemented
HO0201 # 04 Y:1999 04 1999 SHADE WINDOWS FROM SUMMER SUN $3,456 $6,000 Implemented
KU0515 # 06 Y:1999 06 1999 $400,000 $602,110 Implemented
WV0160 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $142 $0 Implemented