Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
982
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0353 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,608 | $800 | Implemented |
OR0353 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $1,927 | $5,600 | Implemented |
BD0140 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,301 | $500 | Implemented |
BD0140 # 06 Y:1999 | 06 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,041 | $840 | Implemented |
BD0140 # 09 Y:1999 | 09 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $30,353 | $10,000 | Implemented |
BD0140 # 11 Y:1999 | 11 | 1999 | MINIMIZE WATER USAGE | $1,471 | $2,590 | Implemented |
BD0140 # 12 Y:1999 | 12 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $243,360 | $500,000 | Implemented |
BD0140 # 13 Y:1999 | 13 | 1999 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $107,799 | $26,500 | Implemented |
BD0140 # 14 Y:1999 | 14 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $31,200 | $16,000 | Implemented |
CO0444 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,280 | $1,000 | Implemented |
CO0444 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $600 | $0 | Implemented |
CO0444 # 05 Y:1999 | 05 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $230 | $0 | Implemented |
IA0222 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $561 | $931 | Implemented |
IA0222 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $391 | $33 | Implemented |
IA0222 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $421 | $226 | Implemented |
IA0222 # 06 Y:1999 | 06 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $3,600 | $900 | Implemented |
IA0222 # 08 Y:1999 | 08 | 1999 | ADD ADDITIONAL PRODUCTION SHIFT | $199,932 | $425,000 | Implemented |
UD0575 # 03 Y:1999 | 03 | 1999 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $39,515 | $10,000 | Implemented |
UD0575 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,341 | $15,000 | Implemented |
WI0350 # 01 Y:1999 | 01 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,546 | $13,122 | Implemented |
WI0350 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $456 | $740 | Implemented |
WI0350 # 06 Y:1999 | 06 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $474 | $500 | Implemented |
OK0566 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,148 | $8,294 | Implemented |
OK0566 # 02 Y:1999 | 02 | 1999 | USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) | $2,054 | $0 | Implemented |
OK0566 # 04 Y:1999 | 04 | 1999 | INSTALL SET-BACK TIMERS | $756 | $630 | Implemented |