Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0826 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $551 | $1,450 | Implemented |
MA0826 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $979 | $1,631 | Implemented |
MA0619 # 09 Y:2007 | 09 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,560 | $1,184 | Implemented |
MA0619 # 07 Y:2007 | 07 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,715 | $19,440 | Implemented |
MA0619 # 06 Y:2007 | 06 | 2007 | REDUCE VENTILATION AIR | $14,409 | $11,500 | Implemented |
MA0619 # 03 Y:2007 | 03 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $42,349 | $10,800 | Implemented |
MA0541 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,264 | $5,500 | Implemented |
MA0541 # 06 Y:2003 | 06 | 2003 | USE MINIMUM STEAM OPERATING PRESSURE | $5,023 | $5,000 | Implemented |
MA0541 # 08 Y:2003 | 08 | 2003 | INSULATE BARE EQUIPMENT | $635 | $260 | Implemented |
MA0528 # 04 Y:2003 | 04 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,752 | $0 | Implemented |
MA0528 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $2,103 | $1,325 | Implemented |
ME0261 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,535 | $25,000 | Implemented |
ME0261 # 09 Y:1999 | 09 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $886 | $200 | Implemented |
ME0261 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,477 | $7,909 | Implemented |
ME0261 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,134 | $900 | Implemented |
ME0261 # 06 Y:1999 | 06 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,704 | $12,000 | Implemented |
ME0261 # 07 Y:1999 | 07 | 1999 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,394 | $3,080 | Implemented |
ME0261 # 08 Y:1999 | 08 | 1999 | INSULATE BARE EQUIPMENT | $1,053 | $1,200 | Implemented |
ME0261 # 11 Y:1999 | 11 | 1999 | DEVELOP A REPAIR/REPLACE POLICY | $271 | $325 | Implemented |
ME0261 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,284 | $80,602 | Implemented |
ME0261 # 12 Y:1999 | 12 | 1999 | $29 | $27 | Implemented | |
ME0261 # 10 Y:1999 | 10 | 1999 | MINIMIZE WATER USAGE | $788 | $500 | Implemented |
MA0428 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,142 | $980 | Implemented |
MA0428 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $642 | $30 | Implemented |
MA0355 # 06 Y:1996 | 06 | 1996 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $960 | $79 | Implemented |