IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0428 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,142 $980 Implemented
MA0428 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $642 $30 Implemented
OR0335 # 04 Y:1998 04 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $310 $0 Implemented
OR0335 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,045 $1,000 Implemented
OR0330 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $4,900 $0 Implemented
SF0149 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $690 $15 Implemented
SF0149 # 09 Y:1998 09 1998 $117,000 $400,000 Implemented
SF0149 # 08 Y:1998 08 1998 $80,000 $40,000 Implemented
SF0149 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,627 $25,680 Implemented
SF0149 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $368 $0 Implemented
AS0228 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $244,239 $410,200 Implemented
AS0228 # 09 Y:1998 09 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $498,755 $240 Implemented
AS0228 # 10 Y:1998 10 1998 $6,873 $3,125 Implemented
CO0423 # 05 Y:1998 05 1998 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT $4,550 $2,000 Implemented
CO0423 # 06 Y:1998 06 1998 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $2,580 $25,000 Implemented
CO0423 # 07 Y:1998 07 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $2,350 $6,900 Implemented
CO0423 # 04 Y:1998 04 1998 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $8,870 $2,500 Implemented
CO0423 # 03 Y:1998 03 1998 MINIMIZE WATER USAGE $9,100 $11,210 Implemented
CO0423 # 02 Y:1998 02 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $140 $420 Implemented
CO0417 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,680 $1,230 Implemented
CO0417 # 09 Y:1998 09 1998 $119,000 $55,330 Implemented
CO0417 # 08 Y:1998 08 1998 $148,000 $560 Implemented
CO0417 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $420 Implemented
CO0417 # 04 Y:1998 04 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $390 $0 Implemented
CO0417 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $860 $50 Implemented