IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

425

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0599 # 02 Y:2000 02 2000 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $8,795 $0 Implemented
UD0599 # 03 Y:2000 03 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,987 $20,000 Implemented
UD0599 # 04 Y:2000 04 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,956 $2,500 Implemented
UD0599 # 06 Y:2000 06 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,628 $0 Implemented
UD0599 # 07 Y:2000 07 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,401 $1,000 Implemented
UF0249 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,575 $6,093 Implemented
UF0249 # 02 Y:2000 02 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $31,004 $50 Implemented
UF0249 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,678 $4,886 Implemented
UD0588 # 02 Y:2000 02 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,705 $0 Implemented
NC0165 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,720 $10,000 Implemented
NC0165 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,539 $1,500 Implemented
NC0165 # 03 Y:1999 03 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $151,290 $29,000 Implemented
NC0165 # 05 Y:1999 05 1999 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $824,740 $836,000 Implemented
UD0576 # 03 Y:1999 03 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,377 $4,700 Implemented
UD0576 # 06 Y:1999 06 1999 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $1,407 $1,000 Implemented
HO0192 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $409 $1,120 Implemented
HO0192 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,083 $520 Implemented
HO0192 # 05 Y:1999 05 1999 INSTALL REPLACEMENT DOORS $562 $700 Implemented
HO0192 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $960 $600 Implemented
HO0192 # 10 Y:1999 10 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,000 $1,000 Implemented
MS0124 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $2,507 $944 Implemented
MS0124 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $400 Implemented
MS0124 # 04 Y:1998 04 1998 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $4,500 $2,888 Implemented
MS0124 # 06 Y:1998 06 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $51 $14 Implemented
AM0284 # 01 Y:1996 01 1996 UPGRADE OBSOLETE EQUIPMENT $899,930 $2,500,000 Implemented