IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,226

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0025 # 07 Y:2002 07 2002 USE SYNTHETIC LUBRICANT $400 $0 Implemented
TA0025 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $307 $338 Implemented
UM0202 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $100 $1,150 Implemented
UM0202 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,069 $1,000 Implemented
UM0202 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,487 $450 Implemented
UM0202 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $10,288 $1,195 Implemented
UM0202 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $737 $1,145 Implemented
UM0202 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $1,180 $2,590 Implemented
OR0402 # 01 Y:2001 01 2001 UPGRADE OBSOLETE EQUIPMENT $53,000 $45,000 Implemented
OR0402 # 02 Y:2001 02 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $6,880 $1,230 Implemented
TA0016 # 01 Y:2001 01 2001 REPLACE BOILER $420,482 $9,456 Implemented
TA0016 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $15,055 $600 Implemented
TA0016 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $13,585 $2,910 Implemented
TA0016 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,090 $1,200 Implemented
TA0016 # 06 Y:2001 06 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,920 $54 Implemented
TA0016 # 07 Y:2001 07 2001 USE PHOTOCELL CONTROLS $1,696 $225 Implemented
TA0016 # 09 Y:2001 09 2001 INSTALL OCCUPANCY SENSORS $1,032 $320 Implemented
TA0016 # 11 Y:2001 11 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $254 $542 Implemented
UM0197 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,283 $21,862 Implemented
UM0197 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,532 $825 Implemented
UM0197 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,898 $1,000 Implemented
UM0197 # 06 Y:2001 06 2001 MINIMIZE WATER USAGE $44,000 $22,000 Implemented
WV0229 # 01 Y:2001 01 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $948 $300 Implemented
WV0229 # 02 Y:2001 02 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $776 $750 Implemented
WV0229 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $1,215 $450 Implemented