Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
70
matching recommendationsSIC | 3714 | Motor Vehicle Parts And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0426 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,240 | $20 | Implemented |
BD0426 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,797 | $5,872 | Implemented |
BD0426 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,390 | $400 | Implemented |
BD0408 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $154 | $20 | Implemented |
BD0408 # 06 Y:2012 | 06 | 2012 | RECOVER AND REUSE WASTE MATERIAL | $975 | $400 | Implemented |
BD0408 # 02 Y:2012 | 02 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $15,937 | $1,500 | Implemented |
BD0408 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,622 | $4,000 | Implemented |
BD0392 # 03 Y:2011 | 03 | 2011 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $6,856 | $55,000 | Implemented |
BD0392 # 05 Y:2011 | 05 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,781 | $3,500 | Implemented |
BD0392 # 08 Y:2011 | 08 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $419 | $10 | Implemented |
BD0392 # 12 Y:2011 | 12 | 2011 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $12,800 | $1,600 | Implemented |
IC0174 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,663 | $0 | Implemented |
IC0174 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,326 | $4,485 | Implemented |
BD0360 # 03 Y:2009 | 03 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,222 | $1,000 | Implemented |
BD0360 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,208 | $20,180 | Implemented |
BD0360 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,740 | $2,700 | Implemented |
IC0146 # 02 Y:2008 | 02 | 2008 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,159 | $0 | Implemented |
IC0146 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $548 | $211 | Implemented |
IC0146 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,631 | $729 | Implemented |
IC0146 # 08 Y:2008 | 08 | 2008 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $541 | $0 | Implemented |
IC0146 # 09 Y:2008 | 09 | 2008 | INSTALL OCCUPANCY SENSORS | $1,535 | $3,688 | Implemented |
IC0146 # 11 Y:2008 | 11 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $679 | $0 | Implemented |
IC0146 # 10 Y:2008 | 10 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $487 | $424 | Implemented |
IC0146 # 03 Y:2008 | 03 | 2008 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $24,543 | $208,785 | Implemented |
IC0131 # 16 Y:2007 | 16 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $32 | $1 | Implemented |