IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0418 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,459 $84,630 Implemented
UA3024 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50,436 $2,500 Implemented
IP0005 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,540 $0 Implemented
IP0005 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $683 $0 Implemented
TT0098 # 05 Y:2012 05 2012 REPAIR AND ELIMINATE STEAM LEAKS $7,381 $980 Implemented
TT0098 # 02 Y:2012 02 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,222 $2,320 Implemented
TT0098 # 01 Y:2012 01 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,053 $1,116 Implemented
TT0097 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,026 $78,780 Implemented
TT0097 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,167 $106,204 Implemented
UA0084 # 07 Y:2012 07 2012 PAY UTILITY BILLS ON TIME $812 $30 Implemented
UA0084 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,492 $9,195 Implemented
UA0084 # 03 Y:2012 03 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,106 $2,157 Implemented
UA0084 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,489 $160 Implemented
UM0405 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,465 $1,400 Implemented
SU0319 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,410 $2,500 Implemented
SU0319 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,147 $1,075 Implemented
SU0319 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $250,480 $603,880 Implemented
SU0319 # 04 Y:2012 04 2012 ELIMINATE/REDUCE AN OPERATION $24,117 $15,840 Implemented
UA0078 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,672 $9,195 Implemented
UA0078 # 05 Y:2012 05 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $10,180 $0 Implemented
UA0078 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $2,072 $1,706 Implemented
BD0408 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,622 $4,000 Implemented
BD0408 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $154 $20 Implemented
BD0408 # 06 Y:2012 06 2012 RECOVER AND REUSE WASTE MATERIAL $975 $400 Implemented
BD0408 # 02 Y:2012 02 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $15,937 $1,500 Implemented