IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

761

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0142 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,737 $0 Implemented
SF0142 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $555 $349 Implemented
SF0142 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,271 $2,284 Implemented
SF0142 # 04 Y:1998 04 1998 USE PHOTOCELL CONTROLS $1,199 $1,000 Implemented
SF0142 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $1,711 $2,464 Implemented
SF0142 # 09 Y:1998 09 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,253 $17,610 Implemented
HO0178 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,430 $2,149 Implemented
HO0178 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,308 $4,853 Implemented
HO0178 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $244 $200 Implemented
HO0178 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,272 $1,000 Implemented
HO0178 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $282 $200 Implemented
HO0178 # 08 Y:1998 08 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $828 $0 Implemented
HO0178 # 10 Y:1998 10 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,500 $360 Implemented
HO0178 # 11 Y:1998 11 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,000 $2,000 Implemented
HO0178 # 12 Y:1998 12 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,429 $30,000 Implemented
HO0178 # 14 Y:1998 14 1998 USE HIGH PRESSURE WASH SYSTEMS $3,945 $500 Implemented
SD0197 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,252 $2,520 Implemented
SD0197 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,569 $350 Implemented
SD0197 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,535 $2,000 Implemented
SD0197 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,149 $23,968 Implemented
SD0197 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,516 $2,000 Implemented
SD0197 # 08 Y:1998 08 1998 WASH AND REUSE RAGS ON-SITE $711 $600 Implemented
SD0197 # 09 Y:1998 09 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $1,350 $1,000 Implemented
SF0137 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $744 $3,630 Implemented
KU0485 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,310 $190 Implemented