IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0573 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $219 $100 Implemented
NC0573 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,606 $76,556 Implemented
NC0573 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,685 $13,453 Implemented
NC0573 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $105 $200 Implemented
NC0387 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $100 Implemented
NC0387 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,156 $85,555 Implemented
NC0310 # 01 Y:2005 01 2005 $167,500 $150,000 Implemented
NC0310 # 02 Y:2005 02 2005 $97,500 $61,250 Implemented
NC0310 # 03 Y:2005 03 2005 $60,000 $20,500 Implemented
NC0310 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,451 $3,000 Implemented
NC0310 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,830 $875 Implemented
NC0310 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $509 $100 Implemented
NC0307 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,171 $100 Implemented
NC0307 # 02 Y:2004 02 2004 $72,400 $49,500 Implemented
NC0224 # 06 Y:2001 06 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $113 $300 Implemented
NC0224 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,339 $1,690 Implemented
NC0224 # 01 Y:2001 01 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,086 $7,500 Implemented
NC0224 # 04 Y:2001 04 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $19,065 $40,000 Implemented
NC0194 # 01 Y:2000 01 2000 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $429 $835 Implemented
NC0194 # 02 Y:2000 02 2000 INSTALL SKYLIGHTS $3,443 $7,000 Implemented
NC0194 # 03 Y:2000 03 2000 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $13,561 $29,000 Implemented
NC0194 # 05 Y:2000 05 2000 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $29,846 $20,200 Implemented
NC0095 # 01 Y:1996 01 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,105 $5,000 Implemented
NC0095 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,473 $6,046 Implemented
NC0095 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $195 $90 Implemented