Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
830
matching recommendationsSIC | 495 | Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0849 # 09 Y:2022 | 09 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,245 | $1,000 | Implemented |
AM0849 # 10 Y:2022 | 10 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $362 | $30 | Implemented |
MZ0325 # 01 Y:2022 | 01 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $113,192 | $0 | Implemented |
MZ0325 # 04 Y:2022 | 04 | 2022 | MINIMIZE WATER USAGE | $50,371 | $4,080 | Implemented |
AM0845 # 01 Y:2022 | 01 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $50,900 | $9,100 | Implemented |
AM0845 # 02 Y:2022 | 02 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $33,965 | $13,500 | Implemented |
AM0845 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $9,077 | $27,090 | Implemented |
AM0845 # 04 Y:2022 | 04 | 2022 | PAY UTILITY BILLS ON TIME | $1,114 | $0 | Implemented |
AM0845 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $649 | $360 | Implemented |
AM0845 # 06 Y:2022 | 06 | 2022 | USE SYNTHETIC LUBRICANT | $302 | $700 | Implemented |
AM0845 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,709 | $15,704 | Implemented |
AM0842 # 01 Y:2022 | 01 | 2022 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $4,317 | $4,220 | Implemented |
AM0842 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $966 | $3,411 | Implemented |
MA0833 # 02 Y:2022 | 02 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,258 | $840 | Implemented |
MA0833 # 03 Y:2022 | 03 | 2022 | USE HEAT PUMP FOR SPACE CONDITIONING | $5,709 | $2,500 | Implemented |
MA0833 # 04 Y:2022 | 04 | 2022 | USE HEAT PUMP FOR SPACE CONDITIONING | $618 | $94,050 | Implemented |
WM0174 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,050 | $8,821 | Implemented |
WM0174 # 04 Y:2022 | 04 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,034 | $0 | Implemented |
WM0174 # 06 Y:2022 | 06 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,216 | $0 | Implemented |
WM0174 # 08 Y:2022 | 08 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $716 | $850 | Implemented |
UF0573 # 01 Y:2022 | 01 | 2022 | USE EXISTING DAM TO GENERATE ELECTRICITY | $223,605 | $552,197 | Implemented |
UF0573 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $50,619 | $45,817 | Implemented |
UF0573 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $35,580 | $50,843 | Implemented |
UF0573 # 04 Y:2022 | 04 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $324,658 | $1,232,000 | Implemented |
UF0573 # 05 Y:2022 | 05 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $35,912 | $10,000 | Implemented |