IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,004

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0311 # 09 Y:2005 09 2005 INSULATE BARE EQUIPMENT $1,173 $885 Implemented
GT0799 # 04 Y:2005 04 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,608 $12,000 Not Implemented
GT0799 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $29,409 $260,000 Not Implemented
SU0206 # 04 Y:2005 04 2005 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $255,262 $207,240 Implemented
SU0206 # 05 Y:2005 05 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $102,975 $200,000 n/a
UD0714 # 16 Y:2005 16 2005 INSULATE BARE EQUIPMENT $361 $650 Not Implemented
UD0714 # 04 Y:2005 04 2005 USE MINIMUM SAFE OVEN VENTILATION $6,825 $3,000 Implemented
UD0714 # 08 Y:2005 08 2005 USE MINIMUM SAFE OVEN VENTILATION $1,972 $150 Implemented
LL0219 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,372 $570 Implemented
CO0560 # 06 Y:2004 06 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $990 $800 Not Implemented
OK0704 # 01 Y:2005 01 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $7,257 $5,175 Not Implemented
SD0357 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $416,473 $750,000 Implemented
MI0101 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,508 $3,000 Not Implemented
MI0101 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $294 $195 Not Implemented
MI0101 # 01 Y:2005 01 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $51,010 $72,500 Not Implemented
OR0479 # 04 Y:2005 04 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,500 $0 Not Implemented
OR0479 # 05 Y:2005 05 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $700 $0 Not Implemented
IC0096 # 04 Y:2005 04 2005 CLOSE OFF UNNEEDED STEAM LINES $2,614 $952 Implemented
IC0096 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,478 $2,371 Implemented
IC0096 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $14,724 $46,000 Not Implemented
IC0096 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $23,508 $21,704 Implemented
LM0092 # 05 Y:2005 05 2005 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $62,655 $140,000 Implemented
MA0571 # 04 Y:2005 04 2005 USE MINIMUM SAFE OVEN VENTILATION $7,370 $1,900 Implemented
IA0361 # 05 Y:2005 05 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $421 $850 Implemented
UM0278 # 01 Y:2005 01 2005 COVER OPEN TANKS $33,962 $480 Implemented