IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0257 # 04 Y:2025 04 2025 USE OPTIMUM TEMPERATURE $1,329 $0 n/a
MZ0372 # 06 Y:2025 06 2025 RECOVER WASTE HEAT FROM EQUIPMENT $7,800 $19,900 n/a
DL0256 # 06 Y:2025 06 2025 RECOVER WASTE HEAT FROM EQUIPMENT $589 $3,250 n/a
AS0605 # 01 Y:2025 01 2025 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,690 $25,500 n/a
TT0333 # 05 Y:2025 05 2025 RECOVER WASTE HEAT FROM EQUIPMENT $3,400 $21,000 n/a
MZ0371 # 03 Y:2025 03 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $1,555 $5,880 n/a
MZ0371 # 02 Y:2025 02 2025 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,063 $3,900 n/a
UD1109 # 04 Y:2025 04 2025 UTILIZE A LESS EXPENSIVE COOLING METHOD $41,149 $75,000 n/a
UU0268 # 06 Y:2025 06 2025 USE OPTIMUM TEMPERATURE $680,810 $2,017,330 n/a
UU0268 # 01 Y:2025 01 2025 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $25,676 $9,660 n/a
UU0268 # 03 Y:2025 03 2025 INSTALL / REPAIR INSULATION ON STEAM LINES $8,514 $6,920 n/a
UU0268 # 04 Y:2025 04 2025 INCREASE AMOUNT OF CONDENSATE RETURNED $31,296 $7,800 n/a
UF0627 # 02 Y:2025 02 2025 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,402 $72,000 n/a
UU0267 # 03 Y:2025 03 2025 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $6,322 $119,100 n/a
UF0627 # 05 Y:2025 05 2025 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $3,491 $0 n/a
LE0596 # 03 Y:2025 03 2025 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $26,110 $14,500 n/a
WV0678 # 10 Y:2025 10 2025 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $4,453 $20,950 n/a
WV0678 # 05 Y:2025 05 2025 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $11,667 $55,000 n/a
WV0678 # 18 Y:2025 18 2025 INSULATE BARE EQUIPMENT $664 $914 n/a
WV0678 # 06 Y:2025 06 2025 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,185 $11,425 n/a
DL0255 # 07 Y:2025 07 2025 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,100 $25,000 n/a
DL0255 # 09 Y:2025 09 2025 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $9,008 $0 n/a
WM0241 # 04 Y:2025 04 2025 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $552 $635 n/a
WV0677 # 09 Y:2025 09 2025 INSULATE BARE EQUIPMENT $290 $446 n/a
WV0677 # 06 Y:2025 06 2025 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $3,254 $14,320 n/a