IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,023

matching recommendations
Reset
ARC 2.72 SPACE CONDITIONING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0594 # 06 Y:2006 06 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,200 $5,050 Not Implemented
UM0312 # 05 Y:2006 05 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,885 $2,250 Implemented
WV0352 # 03 Y:2006 03 2006 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,862 $3,440 Implemented
WV0351 # 01 Y:2006 01 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,565 $20,410 Implemented
SF0336 # 03 Y:2006 03 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $882 $24,000 Not Implemented
SF0336 # 01 Y:2006 01 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16 $0 Implemented
LE0246 # 05 Y:2006 05 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,033 $5,000 Implemented
IA0398 # 10 Y:2006 10 2006 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $16,927 $4,400 Not Implemented
IC0119 # 08 Y:2006 08 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $30,353 $312,000 Not Implemented
UM0310 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,000 $14,850 Implemented
CO0589 # 05 Y:2006 05 2006 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $21,540 $100,800 Not Implemented
CO0589 # 04 Y:2006 04 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $23,960 $0 Implemented
UF0390 # 09 Y:2006 09 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $27,903 $20,000 Not Implemented
UF0390 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $41,661 $1,080 Not Implemented
UD0749 # 10 Y:2006 10 2006 INSTALL TIMERS AND/OR THERMOSTATS $22,598 $20,000 Implemented
NC0344 # 04 Y:2006 04 2006 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $62,722 $50,000 Implemented
SU0241 # 05 Y:2006 05 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,054 $2,928 Implemented
UF0387 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $2,639 $3,360 Not Implemented
UF0386 # 10 Y:2006 10 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $4,883 $846 Not Implemented
UF0386 # 11 Y:2006 11 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,887 $24,500 Not Implemented
UD0748 # 03 Y:2006 03 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,200 $840 Implemented
UD0747 # 08 Y:2006 08 2006 INSTALL TIMERS AND/OR THERMOSTATS $3,095 $760 Not Implemented
IC0118 # 03 Y:2006 03 2006 USE RADIANT HEATER FOR SPOT HEATING $6,871 $6,000 Implemented
WV0347 # 08 Y:2006 08 2006 USE RADIANT HEATER FOR SPOT HEATING $5,557 $2,790 Implemented
MS0300 # 03 Y:2006 03 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $29,145 $4,200 Not Implemented