IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0228 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,279 $0 Implemented
DL0228 # 01 Y:2023 01 2023 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $4,024 $700 Implemented
DL0222 # 07 Y:2023 07 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,366 $25,000 Implemented
DL0222 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $338 $9,500 Implemented
DL0220 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,150 $8,994 Implemented
DL0220 # 02 Y:2023 02 2023 USE OPTIMUM TEMPERATURE $6,980 $0 Implemented
DL0220 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $84,324 $0 Implemented
DL0203 # 12 Y:2022 12 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,363 $3,109 Implemented
DL0203 # 09 Y:2022 09 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $508 $1,000 Implemented
DL0203 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88 $117 Implemented
DL0203 # 07 Y:2022 07 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $567 $0 Implemented
DL0203 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,224 $0 Implemented
DL0189 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,940 $20,000 Implemented
DL0189 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,300 $425 Implemented
DL0189 # 06 Y:2021 06 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,820 $24,000 Implemented
DL0189 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,110 $72,258 Implemented
DL0172 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,137 $8,000 Implemented
DL0169 # 02 Y:2016 02 2016 KEEP EQUIPMENT CLEAN $13,120 $2,500 Implemented
DL0166 # 01 Y:2016 01 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,095 $1,036 Implemented
DL0155 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $500 $0 Implemented
DL0155 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,690 $0 Implemented
DL0149 # 06 Y:2015 06 2015 SHUT OFF PILOTS IN STANDBY EQUIPMENT $870 $50 Implemented
DL0149 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $1,200 Implemented
DL0149 # 05 Y:2015 05 2015 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,140 $40 Implemented
DL0149 # 03 Y:2015 03 2015 INSTALL TIMERS AND/OR THERMOSTATS $6,060 $35 Implemented