Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

459

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0024 # 05 Y:2002 05 2002 CLEAR AND RENT EXISTING SPACE $110,000 $4,500 Implemented
LM0024 # 06 Y:2002 06 2002 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $237,600 $0 Implemented
LM0026 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,166 $1,152 Implemented
LM0026 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $6,152 $4,400 Implemented
LM0026 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,384 $900 Implemented
LM0026 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $250 Implemented
LM0026 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,396 $0 Implemented
LM0025 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,580 $350 Implemented
LM0025 # 05 Y:2002 05 2002 SCHEDULE DELIVERIES ACCORDING TO DEMAND $63,600 $15,000 Implemented
LM0025 # 06 Y:2002 06 2002 DEVELOP STANDARD OPERATING PROCEDURES $31,500 $9,240 Implemented
LM0023 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,237 $500 Implemented
LM0023 # 06 Y:2002 06 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,080 $3,200 Implemented
LM0023 # 07 Y:2002 07 2002 SCHEDULE DELIVERIES ACCORDING TO DEMAND $80,000 $21,770 Implemented
LM0023 # 08 Y:2002 08 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $3,330 $5,000 Implemented
LM0023 # 10 Y:2002 10 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $34,667 $7,348 Implemented
LM0020 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,709 $0 Implemented
LM0020 # 05 Y:2001 05 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,575 $300 Implemented
LM0020 # 06 Y:2001 06 2001 MODIFY WORKLOAD $201,115 $1,000 Implemented
LM0019 # 04 Y:2001 04 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,087 $450 Implemented
LM0019 # 05 Y:2001 05 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $10,000 $3,000 Implemented
LM0021 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,082 $857 Implemented
LM0021 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,680 $48,707 Implemented
LM0021 # 03 Y:2001 03 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,649 $6,000 Implemented
LM0021 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,054 $400 Implemented
LM0018 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $724 $350 Implemented